Your search returned 2 results.

Sort
Results
Minimum Moment Method for Resourc Leveling Using Entropy Maximization by
  • Christodoulou, Symeon E
  • Asce, M
  • Elilnas, Georgios N
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Disorder Considerations in Resource-Constrained Scheduling by
  • Christodoulou, Symeon E
  • Elilnas, Georgios N
Source: Construction Management and Economics
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages