Your search returned 3 results.

Sort
Results
Evaluating Schedule Delay Causes for Private Participating Public Construction Works UnderBuild-Operate-Transfer Model by
  • Yang, Jyh-Bin
  • Yang, Chi-Cheng
  • Kao, Chih-Kuei
Source: International Journal of Project Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Delay and Reflection Noise Macromodeling for Signal Integrity Management of Pcbs and Mcms by
  • Simovich, Slobodan
  • Frazon, Paul
  • Steer, Michael
Source: IEEE Transactions on Components, Packaging, and Manufacturing Technology Part-B: Advanced Packaging
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
A Drift-Diffusion/Monte Carlo Simulation Methodology for Si1-X Hbt Design by
  • Palestri, P
  • Mastrapasqua, M
  • Pacelli, A
  • King, C. A
Source: Ieee Transactions on Electron Devices
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages