Your search returned 5 results.

Sort
Results
Project Phase-Based Contingency Adjustment Framework for Infrastructure Renewal Projects by
  • Shamshiri, Alireza
  • Ryu, Kyeong Rok
  • Park, June Young
  • Choi, Kunhee
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Not available: Engr Abul Kalam Library: Available on Request (1).
A Substation Oriented Approach to Optimal Phasor Measurement Units Placement by
  • Bao, Wei
  • Guo, Rui Peng
  • Han, Zhen Xiang
  • Chen, li Yue
Source: The Economist
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Factors Affecting Cost Contingency InConstruction Industry Contractors Perspective by
  • Enshassi, Adana
  • Ayyash, Abed
Source: International Journal of Construction Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
A Study on Multi-Objective Optimal Power Flow Under Contingency Using Differential Evolution by
  • Mahdad, Belkacem
  • Srairi, K
Source: Journal of Electrical Engineering and Technology
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Contingency Estimation Using a Real Options Approach by
  • Tseng, Chung-li
  • Zhao, Tong
Source: Construction Management and Economics
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages