Your search returned 6 results.

Sort
Results
Using Bargaining Model with Loss Aversion and a Risk of Breakdown to Determine Compensation for Buyback of Early Terminating Bot Highway Projects by
  • Feng, Zhongwei
  • Chao, Qiankun
  • Tan, Chunqiao
  • Yang, Yuzhong
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Not available: Engr Abul Kalam Library: Available on Request (1).
Valuation of Multi-Stage Bot Projects Involving Dedicated Asset Investments: a Sequential Compound Option Approach by
  • Huang, Yu-lin
  • Pi, Chai-Chi
Source: Construction Management and Economics
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Evaluating Schedule Delay Causes for Private Participating Public Construction Works UnderBuild-Operate-Transfer Model by
  • Yang, Jyh-Bin
  • Yang, Chi-Cheng
  • Kao, Chih-Kuei
Source: International Journal of Project Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Hierarchical Structuring of Ppp Risks Using Interpretative Structural Modeling by
  • Lyer, K. C
  • Sagheer, Mohammed
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Concessionaire Selection for Build-Operate-Tranfer Tunnel Projects in Hong Kong by
  • Zhang, X.Q
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Alternative Concession Model for Build Operate Transfer Contract Project by
  • Shen, L.Y
  • Li, Q. M
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages