Your search returned 2 results.

Sort
Results
Economic Manufacturing Quantity Model with Imperfect Rework and Random Breakdown Under Abort/Resume Policy by
  • Chiu, Y-S P
  • Tseng, C-Y
  • liu, W-C
  • Ting, C-K
Source: Journal of Engineering Manufacture, Proceedings OfI Mech E Part-B
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Steering Vector Estimation in Uncalibrated Array. by
  • Griffiths, L. J
  • Feldman, D. D
  • Tseng, C. Y
Source: Ieee Transactions on Signal Processing
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages
Visit counter For Websites

Copyright © 
Engr Abul Kalam Library, NEDUET, 2024