Normal view
MARC view
Entry Topical Term
001 - CONTROL NUMBER
- control field: 811332
003 - CONTROL NUMBER IDENTIFIER
- control field: NEDUET
005 - DATE AND TIME OF LATEST TRANSACTION
- control field: 20230819174229.0
008 - FIXED-LENGTH DATA ELEMENTS
- fixed length control field: 230819|| aca||aabn | a|a d
040 ## - CATALOGING SOURCE
- Original cataloging agency: NEDUET
- Transcribing agency: NEDUET
150 ## - HEADING--TOPICAL TERM
- Topical term or geographic name entry element: OptimizingCorps' Hydroelectric onColumbia River: A Multi-Faceted Ef for t
670 ## - SOURCE DATA FOUND
- Source citation: Work cat.: (NEDUET)763856: Wittinger, Rodney J 811331, The Hydroelectric Design Center ofU.S. Army Corps of Engineers Seeks to IncreaseEfficiency of Hydroelectric Generation At Projects onColumbia and Snake Rivers Through A Number of Activities